Network Steering Committee, RFP Framework Approval, and On-Chain Program Funding
VP-0003
Revisions
Aligns pay commencement and register authority, preserves Service-IP rules for bounties, and restores unchanged Exhibit C.
Makes MSIG
Removes the initial-questionnaire approval exception and pre-Committee build MSIG requirement; flags the missing build procedure.
Removes added cancellation restrictions and repeated checks while retaining the proposer and block producer cancellation routes.
Restores Exhibit B's prior version and blank date; no rate-card content changed in the review-fix commit.
Moves launch tasks to review notes, makes administration instructions self-contained and refreshes references and review guidance.
Defines Committee and BP cancellation routes, distinguishes payment delays and preserves contract-cancellation exceptions.
Restores ECF funding and key-security safeguards; aligns resignation, onboarding, suspension, privacy and oracle recovery.
Keeps award-specific Service handovers and express IP licences; providers retain pre-existing IP and disclose switching limits.
Requires future MSIGs for all five seats, unpaid oversight transition and a nine-month Community-seat fallback.
Proposes revised drafts: MSIG 6.15, Framework 5.5, B 3.5, D 2.5, E 2.2, F 1.9 and questionnaire 1.5/VQ2.
Aligns Schedule A exceptions and references, restores testnet rehearsals and safeguards, and clarifies pricing summaries.
Aligns payment, appointment, contract, and disclosure rules; consolidates duplicates and requires payment-control verification.
Shortens MSIG
Ingests MSIG
Rewrites the Documents section as a review guide for voters and adds a placeholder explaining the unused Exhibit C.
Removes the PRD, the Program Administration Register, and the SOP Fit Analysis, which are working documents outside the vote.
Ingests MSIG
Initial draft.